0
Operating since
+
0
Projects delivered
+
0
Lineal feet sealed
%
0
Rope access certified
SERVICES
ONE TEAM MULTIPLES SOLUTIONS
WINDOW INSTALLATION



GLASS REPLACEMENT



CAULKING & REPAIRS



RAILINGS & BRAKE METAL



ASSESSMENTS & WATER TESTING



CLEANING



ABOUT US
EXPERIENCE THAT REACHES HIGHER
Since 2018 and across more than 350 projects, CIMA has delivered facade and window solutions in demanding environments. Quality is built into every project, from planning to final execution.
- Specialized technicians
- Attention to detail
- Work warranty
- Close supervision
- Fully insured
- Professional reporting
Faster execution and higher productivity
01
Greater precision and safer operation
02
Lower equipment costs and
03
On time. On budget. Built to perform.
04
RDS ADVANTAGES
SMARTER ACCESS. GREATER EFFICIENCY. LESS DISRUPTION
Rope Descent Systems provide direct access to difficult areas with less equipment and greater efficiency.
TAKE A LOOK AT SOME OF OUR WORK
THE RITZ-CARLTON
Installation of railing systems on balconies (East and West Towers)
MIAMI WORLD TOWER
Glass panel replacement and brake metal installation in difficult-access areas.
NATIVO
Glass panel replacement.
SEMINOLE HARD ROCK HOTEL & CASINO (GUITAR HOTEL)
Metal-to-metal, perimeter, and wet-seal application for window wall systems using Dow Corning 790/795/995 via Rope Descent Systems (RDS).
Over 29,000 linear feet of sealant and 600 linear feet of Dowsil 123 Silicone Seal applied..
ONE WEST PALM BEACH (OWPB)
Glass panel replacement.
BROWARD COUNTY CONVENTION CENTER HOTEL
Glass panel replacement..
NAUTILUS 220
Glass panel replacement, top cap and brake metal installation, paint touch-ups, and railing fabrication/installation.
JW MARRIOTT TAMPA WATER STREET
Glass panel replacement and slab cover installation.











WORK WITH US
CONTACT
LET US DISCUSS YOUR NEXT PROJECT!
PBX
(561) 694-5786
17868 Passionflower Cir. Clermont, FL 34714, USA
www.cimaflorida.com